We take pride in all the projects we have successfully completed. Take a look at few of our projects featured here.

The Dubai Mall Fashion Atrium

Dubai, UAE

The Dubai Mall has undergone a massive expansion to cater for its 100 million annual visitors, the construction area of the expansion is approximately 275,308 sqm and extends the existing Fashion Avenue into one of the largest fashion retail areas in the world.

Client
:
Emaar
Main contractor
:
Shapoorji Pallonji
Architect
:
Brewer Smith Brewer Gulf
HVAC contractor
:
Streamline Electromechanical
MEP consultant
:
WSP
Products supplied
:

Products application in the project

Smoke Extract from Retail units

The Dubai Mall Fashion Atrium,Dubai, UAE

Jewel of the Creek Development

Dubai, UAE

Jewel of the Creek is a 1 million sqm mixed use development in the Port Saeed area of Deira occupying a strategic location at the north shore of Dubai Creek. The project incorporates mix of residential, commercial, hospitality and recreational use and will transform this location to a vibrant urban centre and the prominent landmark in the heart of Dubai.

Client
:
Dubai International Real Estate
Main contractor
:
BIC Contracting
Architect
:
Kieferle and Partners
HVAC contractor
:
MEGAMEC
MEP consultant
:
KLING

Products application in the project

Car park, Kitchen extract, Stair & lift pressurization fans

Jewel of the Creek Development,Dubai, UAE

Nakheel Mall, Palm Jumeirah

Dubai, UAE

Located at the heart of the world famous Palm Jumeirah, Nakheel Mall is inspired by luxury and set to become Dubai’s most premium lifestyle shopping, dining and entertainment destination. 4.5 million sq. ft. retail, dining and entertainment destination Nakheel malls flat slabs and column-free spaces are supported on existing piles, requiring close coordination with geotechnical consultants. There are three underground parking levels, with 4,000 spaces where Jet fans manufactured by ELTA Fans are installed.

Client
:
Nakheel
Main contractor
:
UNEC/ACTCO JV
Architect
:
RSP Architecs Planner & Engineers
HVAC contractor
:
AL Arabia Electro Mechanical
MEP consultant
:
WME
Products supplied
:

Products application in the project

Car park smoke extract impulse fans

Nakheel Mall, Palm Jumeirah,Dubai, UAE

Dubai Tram Stations & Depot

Dubai, UAE

Dubai Tram is the first tramway project outside Europe to be powered by ground-based electric supply system. Its each station and depot is equipped with explosion proof ATEX certified supplied by ELTA Fans.

Client
:
RTA (Road Transport Authority)
Main contractor
:
ALSTOM/Six Construct
Architect
:
SYSTRA
HVAC contractor
:
ETA/AL Futtaim
MEP consultant
:
SYSTRA

Products application in the project

Extract from Washing Booth, Toilets, Oil Room, Hazardous battery rooms, Train inspection lane exhaust, Pump room

Dubai Tram Stations & Depot,Dubai, UAE

Al Maktoum Stadium

Dubai, UAE

The project's scope of work involves the extension of sports club. The project includes renovation and additions to the existing Al Nasr Club to increase the existing capacity, with associated facilities and provide a comfortable viewing environment and facilities. The stadium will be equipped to the International tournament standard.

Client
:
Dubai Municipality
Main contractor
:
Binladin Contracting Group
Architect
:
Omar Bin Eid Architects (OBE)
HVAC contractor
:
Binladin Contracting Group
MEP consultant
:
Green Concept Engineering

Products application in the project

Kitchen ,Toilet and General extract units

Al Maktoum Stadium,Dubai, UAE

The Palm Tower, Palm Jumeirah

Dubai, UAE

The project's scope of work consist of a 52-storey mixed use tower located at Palm Jumeirah, Dubai. This project involves a five-star hotel (The St. Regis Dubai – The Palm) and a residential complex.

Client
:
Nakheel
Main contractor
:
Trojan General Contracting
Architect
:
RSP Architecs Planner & Engineers
HVAC contractor
:
National Projects and Construction LLC
MEP consultant
:
WME

Products application in the project

Refrigeration plant, Recycling Area, Transformer room exhaust, Stair and lift pressurisation

The Palm Tower, Palm Jumeirah,Dubai, UAE

Emirates Flight Catering

Dubai, UAE

The project's scope of work consist of a catering facility located at Al Maktoum International Airport, Dubai South, Dubai.Emirates Flight Catering (EKFC) is the largest flight catering kitchen in the world. Bifurcated kitchen extract fans designed and manufactured by ELTA Fans were installed to reduce humidity levels and improve air quality.

Client
:
Emirates
Main contractor
:
Emirates Flight Catering Co. LLC
Architect
:
ENVAC
HVAC contractor
:
ENVAC
MEP consultant
:
Global Engineering Consultants (GEO)
Products supplied
:

Products application in the project

Kitchen extract units

Emirates Flight Catering,Dubai, UAE

Aloft Hotel

Dubai, UAE

The project's scope of work consist of a 15-storey hotel tower located at Deira City Center, Dubai. The project includes an outdoor rooftop cinema. Due to its compact location, the requirement to offer low noise and sized heavy duty smoke extract fans for car park land basement levels were offered by ELTA Fans.

Client
:
AL FUTTAIM
Main contractor
:
LAING O’ROURKE HOLDING
Architect
:
PASCALL + WATSON
HVAC contractor
:
CROWN HOUSE TECHNOLOGY
MEP consultant
:
Foreman Roberts

Products application in the project

Car park, Kitchen ,Toilet and General extract units

Aloft Hotel,Dubai, UAE

Audi & Porsche Workshop

Dubai, UAE

The project constitutes solar power plant including 25,000 solar panels on its car park and roofs, which will produce 10 million units of electrical energy in a year. The result means an Offset of 5.3 million kg of CO2 every year. Equivalent to offsetting the annual CO2 emissions of 1600 passenger vehicles. The Facility would also be having its very own Club House built on a 500 sqm site and a Parcour Driving Experience Track. The Car parks in this Facility have been designed to suit electric car charging stations using the Porsche e-mobility concept, one of the first of its kind in the UAE. The system will provide electric energy to the facility, protection of vehicles from extreme weather as well as charging stations for hybrid and electric versions of Audi, Porsche and Volkswagen models. The design of the power plant is done considering local weather conditions with the emphasis on optimizing energy production, available space and ease of cleaning.

Client
:
Al Nabooda Automobiles
Main contractor
:
AL SAHEL CONTRACTING LLC
Architect
:
NEB (National Engineering Bureau)
HVAC contractor
:
SENSAIRE LLC
MEP consultant
:
IBA (Ian Banham & Associates)

Products application in the project

Smoke and Toilet extract units

Audi & Porsche Workshop,Dubai, UAE

First Avenue Mall

Dubai, UAE

The project's scope of work consists of a mall & hotel in Motor City, Dubai. The First Avenue Mall will consist of 70 retail outlets and 15 dining facilities built on 43,000 square meters of land and underground car park with 400 spaces.

Client
:
AL TAWFEEQ DEVELOPMENT & INVESTMENT
Main contractor
:
PIVOT Engineering
Architect
:
DEWAN Architects
HVAC contractor
:
PIVOT Engineering
MEP consultant
:
DEWAN

Products application in the project

Car park and general extract, Stair & lift pressurisation units

First Avenue Mall,Dubai, UAE

Jameel Arts Centre

Dubai, UAE

The project's scope of work consist of a 4-storey art center located at Al Jaddaf, Dubai. The Jameel Art Centre (JAC) in Dubai will be a leading institution for contemporary art and will be the home for the Jameel Art Collection and the Jameel Prize. The center is intended to become a creative hub promoting entrepreneurship and emerging artists from the Middle East, North Africa and the rest of the world. The center includes more than 1200 square meters of dedicated gallery space, a 300 square meters the open-access research center, flexible studio and events spaces, a cafe and bookshop.

Client
:
ART JAMEEL Community Initiatives
Main contractor
:
STRABAG LLC
Architect
:
SERIE Architects
HVAC contractor
:
STRABAG LLC
MEP consultant
:
WME
Products supplied
:

Products application in the project

Smoke and general extract units

Jameel Arts Centre,Dubai, UAE

Remraam Housing Development

Dubai, UAE

The project's scope of work consists of 198 residential buildings located at Dubailand, Dubai. The project will be arranged into 6 clusters, each with two sectors, and will range from 6 to 8 floors.

Client
:
DUBAI Properties
Main contractor
:
ENGINEERING CONTRACTING COMPANY LLC
Architect
:
DAR (Design & ARchitecture Bureau)
HVAC contractor
:
United Masters Electromechanical LLC
MEP consultant
:
KHATIB & ALAMI

Products application in the project

Car par extract, Toilet extract units

Remraam Housing Development,Dubai, UAE

The Beach Retail Development

Dubai, UAE

The Beach presents architecture that is both playful and contemporary, drawing influences from the local culture whilst responding to the distinctive beachfront location. Responding to the existing urban language the buildings will cascade towards the beachfront creating shade and relief along the extent of the promenade. Punctuated by the 'Jewel' icon building, each of the plazas will vary in aesthic providing unique and distinct zones which are surrounded by calming water features. The project's scope of work consist of a mixed-use development located at Jumeirah Beach Residence, Dubai. Formed around a pedestrian esplanade that meanders between four distinct plazas and stretching from the existing Sheraton hotel right down to the Hilton Hotel, THE BEACH will include a dynamic mix of top brands and attractions offering everything from casual eating, signature fine dining, luxury retail.

Client
:
MERAAS Development
Main contractor
:
KHANSAHEB Contracting
Architect
:
BENOY
HVAC contractor
:
ETA
MEP consultant
:
Clarke Samadhin Associates

Products application in the project

Car park extract, Toilet and General extract units.

The Beach Retail Development,Dubai, UAE

YAS Mall

Abu Dhabi, UAE

Located in the world famous Yas island and adjacent to the Ferrari world and Yas marina formula 1 cicuit, The project consist of a shopping mall shops, restaurants, cinemas and leisure centres. Its breathtaking interiors include the largest naturally lit central gathering space in any mall in the Middle East whilst its exterior is beautifully crafted to look like a glistening beacon in the city.

Client
:
AL DAR Properties
Main contractor
:
KHANSAHEB Contracting
Architect
:
Callison RTKL
HVAC contractor
:
KHANSAHEB Contracting
MEP consultant
:
BLUEHAUS ENGINEERING

Products application in the project

Retail smoke extract and Kitchen extract units

YAS Mall,Abu Dhabi, UAE

Capitol Gate Tower

Abu Dhabi, UAE

Capital Gate, also known as the Leaning Tower of Abu Dhabi, is a skyscraper in Abu Dhabi. It's over 160 meters tall, 35 stories high, with over 16,000 square meters of usable office space, Capital Gate is one of the tallest buildings in the city. It is designed to incline 18° west. In June 2010, Guinness World Records certified Capital Gate tower as the world's "Farthest man-made leaning building". The new record shows that the Capital Gate tower has been built to lean 18° west, which is more than four times that of the Leaning Tower of Suurhusen. The gravitational pressure caused by the 18° incline is countered by a technique called pre-cambered core, using a core of concrete reinforced with steel, with the core deliberately built slightly off-center. It is also anchored to the ground by 490 piles which are drilled 20–30 meters underground.

Client
:
ADNEC (Abu Dhabi National Exhibitions Company)
Main contractor
:
Al Habtoor Engineering Enterprises
Architect
:
RMJM (Robert Matthew Johnson Marshall)
HVAC contractor
:
ETA
MEP consultant
:
RMJM (Robert Matthew Johnson Marshall)

Products application in the project

Car park extract, Toilet and General extract units.

Capitol Gate Tower,Abu Dhabi, UAE

AL JIMI Mall

AL AIN, UAE

The project's scope of work involves the expansion of the existing retail mall located at at Al Jimi District, Al Ain. The expansion includes an additional of 33,000 square metres (sq. m.) of gross leasable area (GLA), increasing the total leased area to 76,000 sq. m. of retail space.

Client
:
ALDAR Properties
Main contractor
:
PIVOT Engineering
Architect
:
ACG (Architectural consulting group)
HVAC contractor
:
PIVOT Engineering
MEP consultant
:
JACOBS International

Products application in the project

Car park extract, Toilet and General extract units.

AL JIMI Mall,AL AIN, UAE

Al Raha Beach Development

Abu Dhabi, UAE

The project's scope of work consists of a mixed-use waterfront development located at Al Raha Beach, Abu Dhabi. The development includes construction of 11 precincts that include hotels, marinas, parks, restaurants as well as leisure facilities. The development will be home to a host of hotels, beaches, marinas, and hi-end retail and commercial complexes. The project also boasts world-class education and health care services.

Client
:
ADCE (Abu Dhabi Commercial Engineering)
Main contractor
:
AL SWEIDI & SHAMS
Architect
:
MAKAN
HVAC contractor
:
AL SWEIDI & SHAMS
MEP consultant
:
MAKAN CONSULTING ENGINEERS

Products application in the project

Car park extract, Toilet and General extract units.

Al Raha Beach Development,Abu Dhabi, UAE

& many more...